General polish for BOS 0.6.2 #9

Closed
opened 2026-09-05 02:19:54 +08:00 by Breadway · 2 comments
Owner

all TODO, REVIEW, and BACKLOG tasks from the BOS 0.6.2 cycle need to be cleared before BOS 0.6.2 is released.

all TODO, REVIEW, and BACKLOG tasks from the BOS 0.6.2 cycle need to be cleared before BOS 0.6.2 is released.
Author
Owner

Board swept. TODO, REVIEW, and BACKLOG are now clear except for 4 items that are not resolvable by working the queue further:

  • BB-58, BB-59, BB-60: genuinely blocked on things only the user can do (Forgejo org admin access, a broken GitHub mirror token, minting release secrets). Left in backlog with notes.
  • BOX-8: investigated, root-cause hypothesis documented (likely a layer-shell keyboard-exclusive-grab loss in Hyprland/gtk4-layer-shell), no verified fix found. Left in todo.
  • ECO-15: a meta/index issue tracking an ecosystem audit; its real actionable sub-items are already resolved or tracked separately. Not itself actionable.

Everything else that was in the queue this pass (ECO-21, ECO-25, CLIP-7, PAD-6, BSET-10, plus BOS-13/14/15 from this same prep) is merged or closed. Leaving this open for the user to confirm the bar is met, since the remaining 4 aren't things I can clear myself.

Board swept. TODO, REVIEW, and BACKLOG are now clear except for 4 items that are not resolvable by working the queue further: - BB-58, BB-59, BB-60: genuinely blocked on things only the user can do (Forgejo org admin access, a broken GitHub mirror token, minting release secrets). Left in backlog with notes. - BOX-8: investigated, root-cause hypothesis documented (likely a layer-shell keyboard-exclusive-grab loss in Hyprland/gtk4-layer-shell), no verified fix found. Left in todo. - ECO-15: a meta/index issue tracking an ecosystem audit; its real actionable sub-items are already resolved or tracked separately. Not itself actionable. Everything else that was in the queue this pass (ECO-21, ECO-25, CLIP-7, PAD-6, BSET-10, plus BOS-13/14/15 from this same prep) is merged or closed. Leaving this open for the user to confirm the bar is met, since the remaining 4 aren't things I can clear myself.
Author
Owner

Full ecosystem promotion pass complete. All 13 packages BOS ships were checked against what actually shipped in v0.6.1, and 12 of them had real unreleased work that got promoted dev -> rc -> stable, each individually verified live on dl.breadway.dev before being re-pinned into iso/bread-lockfile.toml (merged, PR #16). CHANGELOG.md's [Unreleased] section reflects the real content of every bump, not just version numbers.

Two real infrastructure bugs were found and fixed along the way: a root-owned CI cache directory on hestia breaking job cleanup (BB-61), and a missing build step in bos-settings' rc-release.yml (PR #14, merged). A third (ECO-28, a shared temp-path race under concurrent releases) was found and documented but not fixed, tracked for follow-up.

main is now 0.6.2-ready. Still waiting on the user's explicit go-ahead before any BOS tag gets pushed, per the standing release-confirm gate.

Full ecosystem promotion pass complete. All 13 packages BOS ships were checked against what actually shipped in v0.6.1, and 12 of them had real unreleased work that got promoted dev -> rc -> stable, each individually verified live on dl.breadway.dev before being re-pinned into iso/bread-lockfile.toml (merged, PR #16). CHANGELOG.md's [Unreleased] section reflects the real content of every bump, not just version numbers. Two real infrastructure bugs were found and fixed along the way: a root-owned CI cache directory on hestia breaking job cleanup (BB-61), and a missing build step in bos-settings' rc-release.yml (PR #14, merged). A third (ECO-28, a shared temp-path race under concurrent releases) was found and documented but not fixed, tracked for follow-up. main is now 0.6.2-ready. Still waiting on the user's explicit go-ahead before any BOS tag gets pushed, per the standing release-confirm gate.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Breadway/bos#9
No description provided.