ci: retrigger dev-release for ECO-38 verification #6

Merged
Breadway merged 1 commit from chore/retrigger-dev-release into main 2026-09-28 21:52:36 +08:00
Owner

Part of ECO-38. The dev-release run after the ECO-38 wiring merged failed after 4m9s with no diagnosable cause via the Forgejo API (no log endpoint). Local reproduction of the exact same checkout/dev-deps.sh/build commands succeeded cleanly. Retriggering with an empty commit to confirm this was transient runner contention (many repos' dev-release ran back to back during the rollout).

Part of ECO-38. The dev-release run after the ECO-38 wiring merged failed after 4m9s with no diagnosable cause via the Forgejo API (no log endpoint). Local reproduction of the exact same checkout/dev-deps.sh/build commands succeeded cleanly. Retriggering with an empty commit to confirm this was transient runner contention (many repos' dev-release ran back to back during the rollout).
ci: retrigger dev-release for ECO-38 verification
Some checks failed
check / check (pull_request) Failing after 0s
4da7a32bf9
Previous dev-release run failed quickly with no diagnosable cause via
the Forgejo API; local reproduction of the exact same dev-deps.sh and
build commands succeeded cleanly. Retriggering to confirm this was
transient runner contention from the burst of first-time dev-release
runs during the ECO-38 rollout.
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Breadway/breadarr!6
No description provided.