ci: isolate RC release index cleanup #18

Merged
Breadway merged 1 commit from fix/clip-17-rc-cache-cleanup into main 2026-10-02 12:04:28 +08:00
Owner

Removes the shared wildcard cleanup from the beta index workflow, uses a prefix that older workflows do not match, and cleans only this job's clone on exit.

Verified workflow YAML and shell syntax. Simulated success and failure index generation; the job clone was cleaned and a sibling legacy-prefix checkout remained intact.

Closes #17

Removes the shared wildcard cleanup from the beta index workflow, uses a prefix that older workflows do not match, and cleans only this job's clone on exit. Verified workflow YAML and shell syntax. Simulated success and failure index generation; the job clone was cleaned and a sibling legacy-prefix checkout remained intact. Closes #17
fix: scope breadclip RC cache cleanup
All checks were successful
check / check (push) Successful in 6m51s
619857791e
Author
Owner

Synced from #18, closing CLIP-17. The isolated success/failure acceptance and diff checks pass. Forgejo CI is running, so this PR card remains TODO until CI and independent source review complete.

Synced from https://git.breadway.dev/Breadway/breadclip/pulls/18, closing CLIP-17. The isolated success/failure acceptance and diff checks pass. Forgejo CI is running, so this PR card remains TODO until CI and independent source review complete.
Author
Owner

PR #18 passes local YAML and shell checks plus success/failure cleanup simulations with a legacy-prefix sibling preserved. Forgejo CI was queued at last check. Moving to REVIEW for independent review; if CI fails, return it to TODO with the failure recorded.

PR #18 passes local YAML and shell checks plus success/failure cleanup simulations with a legacy-prefix sibling preserved. Forgejo CI was queued at last check. Moving to REVIEW for independent review; if CI fails, return it to TODO with the failure recorded.
Author
Owner

Forgejo CI passed in 6m51s on head 619857791e111fa1776f78562995acb83dd0426a. The acceptance harness passed for success and failure, preserving the active legacy-prefix sibling. Moving this linked PR card to REVIEW.

Forgejo CI passed in 6m51s on head `619857791e111fa1776f78562995acb83dd0426a`. The acceptance harness passed for success and failure, preserving the active legacy-prefix sibling. Moving this linked PR card to REVIEW.
Sign in to join this conversation.
No reviewers
No labels
ci
enhancement
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
Breadway/breadclip!18
No description provided.